Alaa Sobhy

Construction worker
Refrence No : $7003
June 1, 2001

About Candidate

Seeking a challenging opportunity in the field of MEP that could utilize my academic background, my skills
and fulfill my personal ambition and enhance my knowledge.

Education

B
B.Sc. in Mechanical Power Engineering 2014
Helwan University

Cumulative Grade: Good. Graduation Project: Design of Fire Fighting and Air Conditioning System for an Administration Building. Project Grade: Excellent

Work & Experience

S
Senior Mechanical Site engineer May-2022 - Present
SOLERA

ED west El Sheikh Zayed-ORA Developers Project responsible for: - • Infrastructure (Sewage -Fire Fighting- Portable Water and Irrigation) Networks. • Fire Fighting: - (FM200 & CO2 & fire search)

S
Senior Mechanical Site engineer & QS 2021 - 2022
Energy and Contracting Solutions

CAIRO BUISINESS PARK- Misr Italia Project responsible for: - • Plumbing: - (LAKE - FOUNTAINS - Toilets- Drainage and water supply for buildingIrrigation). • Fire Fighting: - (Pump room-Wet Pipe System -FM200 & CO2 & fire search). • HVAC: - (absorption chillers sys. - FAN’S- AHU …..).

M
Mechanical Site engineer & QS 2020 - 2021
Energy and Contracting Solutions

LANOVA VISTA MALL- Misr Italia Project responsible for: - • Infrastructure (Sewage - Fire Fighting - Portable Water and Irrigation) Networks. • Plumbing: - (Toilets- Drainage and water supply for building). • Fire Fighting: - (Pump room - Wet Pipe System-FM200&CO2 Sys.). • HVAC: - (absorption chillers sys. - FANS- AHU …..).

M
Mechanical Site engineer & QS 2019 - 2020
Energy and Contracting Solutions

own Center-Marakez Project responsible for: - • Infrastructure (Sewage - Fire Fighting - Portable Water and Irrigation) • Plumbing: - (Toilets- Drainage and water supply for building). • Fire Fighting: - (Pump room-Wet Pipe System-FM200 & CO2 Sys.). • HVAC: - (Roof top package unite-FANS - SPLIT UNITS …..).

M
Mechanical Site engineer & QS 2018 - 2019
Energy and Contracting Solutions

SODIC Forty west Project – Phase II ( Compound& clubhouse) responsible for: • Infrastructure (Sewage -Fire Fighting- Portable Water and Irrigation) Networks. • Plumbing: - (Swimming pool - Gas water heater room -Toilets-Submersible pump). • Fire Fighting: - (Wet Pipe System-FM200&CO2 Sys.). • HVAC: - (VRF System – FANS - AHU - SPLIT UNITS …..).

M
Mechanical Site engineer December-2014 - December-2017
Consukorra Company

Horusfor pharmaceutical -Project total area is 175,000m2 responsible for :- HVAC: - (Total cooling capacity 5000RT -HVAC system consists of (Chiller System, AHU, FCU, FANS, Dryer, VAV Box and Air valves…..). Plumbing :- • Infrastructure (Drainage (Sewage & Industrial)-Fire Fighting- Portable Water and Irrigation) Networks. • (Toilets -Water Supply & Drainage networks -Compressed Air system) in the buildings. Fire Fighting: - (Pump room- Wet Pipe System- FM200 & CO2 Sys.-Foam Sys.). Steam & Condensate System.